Providing an executive solution for the Recovery of unit 4-0 32 MW of Isfahan power plant after the fire incident

1402-06-26
آتش‌سوزی واحد ۴ نیروگاه اصفهان — پروژه بازگشت واحد به مدار تولید تپکو

The purpose of this project was to investigate, feasibility study and partial design for the operation of unit 5 tower jointly for units 4 and 5, which was completed in less than two months and unit 4 of Isfahan power plant returned to the production cycle.